Opanuku Pathway Connection: An acceptable solution?
The Lower Opanuku Pathway Connection sucks
There's a new section of shared path in Henderson. It exists to link two existing paths that have been there for nearly two decades, built between 2007–2009 as part of Project Twin Streams, to solve a problem caused by motor vehicles.
At the end of Keeling Road trucks, cars, and trailers were often parked on the short stretch of road between the broken sections of the Opanuku Stream Path (labelled Lower Opanuku Cycleway on the map). For path users there was no alternative other than to take to the road; fine for confident users but not acceptable for all.

A solution, but acceptable?
There was an AT consultation for the project, and much celebration by the Local Board members when the 'solution' recently opened.
They built a few metres of new path to keep pedestrians and bikes off the road, but the result is a half-arsed compromise that should not be considered acceptable.
While in construction I was impressed to see work around an existing power pole and assumed it would be relocated to the kerb, like another nearby pole already is.
But the end solution not only retains the power pole obstruction, it barely even acknowledges it exists. Path markings and centreline just ignore it, as if you could ride or walk right through it with just a cautionary 'Slow' marking on one side only. I guess hitting a pole, or on coming walker/cyclist, going slow is better than going fast...




The pole, as seen from either approach
Would this be acceptable for a road?
Would a new road be considered complete with an existing power pole in the middle, unadorned, be considered acceptable? Why is it acceptable for other modes?
I'm sure the answer will include the words 'project scope', 'budget', 'compromise' but wonder why a solution that has taken nearly two decades to deliver is so poor?
At least mark around it?
If nothing else at least the markings should acknowledge the pole is there, mock-up below, and it should have reflectors on it or flex-batten barriers to guide bikes around it. It's also ironic that the dashed yellow line added as part of the project, if enforced, would have eliminated most of the issues this path exists to resolve.